Reclaiming Roads. Restoring Strength.

Our Full Depth Reclamation (FDR) services recycle existing pavement and base materials in place, creating a stronger, more durable foundation without the cost or waste of full reconstruction. FDR is ideal for deteriorated roadways, parking lots, and industrial surfaces where traditional patching no longer holds up.

By pulverizing the existing pavement, blending it with stabilizing agents like cement or lime, and compacting it into a new base, we deliver performance equal to or better than new construction—faster and more affordably. The result is a seamless, high-strength base ready for a new surface course.

Our Full Depth Reclamation Services

  • In-place pulverizing and blending of existing pavement
  • Cement or lime stabilization for added strength
  • Grading, shaping, and compaction of the new base
  • Final surface preparation for asphalt or concrete paving
  • Depth control and quality testing throughout the process

Why Choose Chilton Contractors?

Sustainable and Cost-Effective
FDR drastically reduces the need for haul-off and new material import, cutting project costs and minimizing environmental impact.

Advanced Equipment, Proven Techniques
Our GPS-enabled reclaimers and experienced operators ensure precise depth control and uniform mixing for consistent results across every pass.

Long-Term Performance
FDR eliminates reflective cracking and strengthens the entire pavement structure from the ground up, extending the life of the surface for years to come.

Benefits at a Glance

  • Eliminates costly removal and replacement
  • Strengthens and stabilizes weak road sections
  • Shortens construction timelines
  • Ideal for rural, municipal, and industrial roads
  • Environmentally responsible with minimal material waste

Affiliations