Laying the Foundation for What’s to Come

Before any building can rise or any road can open, essential systems need to run below the surface. At Chilton Contractors Inc., our Underground Utilities division handles the critical infrastructure that keeps communities functioning — water, sewer, storm drainage, and conduit systems — all installed with precision, safety, and long-term reliability in mind.

Whether it’s a large commercial site or a municipal development, we provide start-to-finish utility installation services that are tightly coordinated with your overall site plan and timeline.

What We Install

  • Water mains and service lines
  • Sanitary sewer and force mains
  • Storm drainage systems
  • Electrical and communication conduit
  • Lift stations and manholes

Why Choose Chilton Contractors For Underground Utilities?

Technical Accuracy
We use GPS-enabled excavation and trenching tools to ensure that each pipe and conduit is installed at the right depth, grade, and alignment — reducing the risk of failure or future repair.

Safety & Compliance
Our team is trained and certified for confined space entry, shoring systems, and OSHA safety requirements. Every utility installation follows local codes and industry standards to the letter.

Seamless Coordination
We work closely with utility companies, engineers, and general contractors to make sure our portion of the project aligns perfectly with all other site activity — minimizing delays and rework.

Benefits of Working with Chilton Contractors

  • Long-lasting infrastructure with minimal maintenance
  • Reduced downtime through accurate installations
  • Fewer change orders and call-backs
  • Peace of mind that systems are built to code

Affiliations